Reconciles each project's Primary Hold-Up against its computed Stage of Job / Stage of PreCom and the dev-view gate columns β€” flagging which side is out of date.

Dataset: 49 Programs 2026 Tracker(2).xlsm Β· change

Projects checked

414

Aligned

373

Flagged

41

βˆ’2 likely false positive

Triage

3 assigned Β· 17 resolved

17 resolved but still flagged β€” recheck

AI QC passall 41 checked Β· 2 hidden as false positiveusing Sonnet 4.6
Bulk Β· 22 shown
PM 35118880Loc 1SwitchhighHold-up staleAI: confirmed Β· high

Stage of Job: Pending Only Permits

Stage of PreCom: PreComm Not Required

Asset feedback pendingshould bePermit pending

The dev-view gates have advanced to "Permit pending", but the Primary Hold-Up still says "Asset feedback pending" β€” advance the hold-up to match.

Basis: Stage of Job = Pending Only Permits

assigned Jul 10, 2026
Reviewer note

Stage of Job has advanced to 'Pending Only Permits' and Open Dependencies explicitly lists 'Land Permit', confirming the project is blocked by a permit β€” not asset feedback. The 'Asset feedback pending' hold-up is stale and no longer reflects the current bottleneck. Updating it to 'Permit pending' brings it into alignment with both the computed stage and the open dependency.

Action: Change Primary Hold-Up from 'Asset feedback pending' to 'Permit pending'

PM 35569360Loc 1FShighHold-up staleAI: uncertain Β· low

Stage of Job: Installed Awaiting Commissioning

Stage of PreCom: PreComm Complete

Mapping pendingshould beADMS test pending

The dev-view gates have advanced to "ADMS test pending", but the Primary Hold-Up still says "Mapping pending" β€” advance the hold-up to match.

Basis: Stage of Job = Installed Awaiting Commissioning

Reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35643280Loc 2LR-GWhighHold-up staleAI: confirmed Β· high

Stage of Job: Pending Permits and Pre-Comm

Stage of PreCom: Pending DLT PreComm

Device delivery pendingshould beDLT - Pre-comm pending

Material Delivered Date is set β€” device is no longer pending.

Basis: Stage of PreCom = Pending DLT PreComm

Reviewer note

Material Delivered Date is set (2026-04-30) and Controller Delivered Date is also set (2026-04-08), meaning device delivery is complete and 'Device delivery pending' is no longer accurate. Stage of PreCom has advanced to 'Pending DLT PreComm', and DLT Site Visit Status is 'NOTN' (not started), confirming the project is now waiting on DLT pre-commissioning. The Primary Hold-Up must be updated to reflect this current blocker.

Action: Change Primary Hold-Up from 'Device delivery pending' to 'DLT - Pre-comm pending'

PM 35645048Loc 1LR-GWhighHold-up staleAI: confirmed Β· high

Stage of Job: Precomm not Met, Return to PEND

Stage of PreCom: Pending DLT PreComm

Device delivery pendingshould beDLT - Pre-comm pending

Material Delivered Date is set β€” device is no longer pending.

Basis: Stage of PreCom = Pending DLT PreComm

Reviewer note

Material Delivered Date is set (2026-05-13) and Controller Delivered Date is also set (2026-03-04), meaning device delivery is no longer the blocking issue. Stage of PreCom has already advanced to 'Pending DLT PreComm', which is consistent with DLT Site Visit Status = NOTN being the current bottleneck. The Primary Hold-Up of 'Device delivery pending' is therefore stale and should be updated to 'DLT - Pre-comm pending' to match the computed stage.

Action: Change Primary Hold-Up from 'Device delivery pending' to 'DLT - Pre-comm pending'

PM 35647117Loc 2SCADAMATEhighHold-up staleAI: uncertain Β· low

Stage of Job: Pending Permits and Pre-Comm

Stage of PreCom: Pending Settings

Pending Program Reviewshould beSettings pending

The dev-view gates have advanced to "Settings pending", but the Primary Hold-Up still says "Pending Program Review" β€” advance the hold-up to match.

Basis: Stage of PreCom = Pending Settings

Reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35655230Loc 1FShighHold-up staleAI: confirmed Β· high

Stage of Job: Pending Only Pre-Comm (Permits Completed)

Stage of PreCom: Pending DLT PreComm

Device delivery pendingshould beDLT - Pre-comm pending

Material Delivered Date is set β€” device is no longer pending.

Basis: Stage of PreCom = Pending DLT PreComm

Reviewer note

Material Delivered Date (2026-04-13) and Controller Delivered Date (2026-05-27) are both set, meaning device delivery is complete and 'Device delivery pending' is no longer accurate. The computed Stage of PreCom = 'Pending DLT PreComm' confirms the project has advanced past delivery and is now awaiting DLT pre-commissioning. The Primary Hold-Up must be updated to reflect the current blocker.

Action: Change Primary Hold-Up from 'Device delivery pending' to 'DLT - Pre-comm pending'

PM 35659946Loc 1LR-GWhighHold-up staleAI: confirmed Β· high

Stage of Job: Pending Permits and Pre-Comm

Stage of PreCom: Pending DLT PreComm

Device delivery pendingshould beDLT - Pre-comm pending

Material Delivered Date is set β€” device is no longer pending.

Basis: Stage of PreCom = Pending DLT PreComm

Reviewer note

Material Delivered Date (2026-06-12) and Controller Delivered Date (2026-06-10) are both set, confirming device delivery is complete β€” making 'Device delivery pending' stale. Stage of PreCom has advanced to 'Pending DLT PreComm', and DLT Site Visit Status is 'NOTN' (Not Started), which is consistent with the next blocker being the DLT pre-commissioning visit. The open dependency on a Permit MiscTSK also aligns with Stage of Job = 'Pending Permits and Pre-Comm', but the primary hold-up label should reflect the PreCom stage.

Action: Change Primary Hold-Up from 'Device delivery pending' to 'DLT - Pre-comm pending'

PM 35661324Loc 2LR-SELhighDev columns staleAI: uncertain Β· low

Stage of Job: Pending Permits and Pre-Comm

Stage of PreCom: IT/DLT information is missing

Permit pendingshould be(fill IT/DLT dev columns)

The computed Stage of Job / Stage of PreCom aren't available, so the hold-up can't be checked β€” fill the IT/DLT dev-view columns and recompute.

Basis: Stage of PreCom = IT/DLT information is missing

Reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35663537Loc 13-Way 3-Way SCADA SWhighDev columns staleAI: uncertain Β· low

Stage of Job: Pending Only Pre-Comm (Permits Completed)

Stage of PreCom: Pending Settings

DLT - Pre-comm pendingshould beSettings pending

The Primary Hold-Up "DLT - Pre-comm pending" is further along than the dev-view gates, which still point to "Settings pending" β€” update the gate column so the stages catch up.

Basis: Stage of PreCom = Pending Settings

Reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35663601Loc 1FShighDev columns staleAI: uncertain Β· low

Stage of Job: Pending Permits and Pre-Comm

Stage of PreCom: IT/DLT information is missing

Permit pendingshould be(fill IT/DLT dev columns)

The computed Stage of Job / Stage of PreCom aren't available, so the hold-up can't be checked β€” fill the IT/DLT dev-view columns and recompute.

Basis: Stage of PreCom = IT/DLT information is missing

Reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35362471Loc 1FusemediumHold-up staleAI: uncertain Β· low

Stage of Job: Installed, Commissioning Not Required

Stage of PreCom: PreComm Not Required

CN24 pendingshould beJob Completed

The dev-view gates have advanced to "Job Completed", but the Primary Hold-Up still says "CN24 pending" β€” advance the hold-up to match.

Basis: Stage of Job = Installed, Commissioning Not Required

assigned Jul 10, 2026
Reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35593150Loc 4Sub IntmediumHold-up staleAI: uncertain Β· low

Stage of Job: Pending Only Pre-Comm (Permits Completed)

Stage of PreCom: Pending Device

Settings pendingshould beDevice delivery pending

The dev-view gates have advanced to "Device delivery pending", but the Primary Hold-Up still says "Settings pending" β€” advance the hold-up to match.

Basis: Stage of PreCom = Pending Device

Reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35648391Loc 2SCADAMATE SwitchmediumDev columns staleAI: uncertain Β· low

Stage of Job: Pending Only Pre-Comm (Permits Completed)

Stage of PreCom: Pending DLT PreComm

PC25 request pendingshould beDLT - Pre-comm pending

The Primary Hold-Up "PC25 request pending" is further along than the dev-view gates, which still point to "DLT - Pre-comm pending" β€” update the gate column so the stages catch up.

Basis: Stage of PreCom = Pending DLT PreComm

+ Add reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 356484973 line items
Loc 1LR-GWmediumDev columns staleAI: uncertain Β· low

Stage of Job: Pending Only Permits

Stage of PreCom: PreComm Complete

PC25 request pendingshould bePermit pending

The Primary Hold-Up "PC25 request pending" is further along than the dev-view gates, which still point to "Permit pending" β€” update the gate column so the stages catch up.

Basis: Stage of Job = Pending Only Permits

+ Add reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

Loc 2LR-GWmediumDev columns staleAI: uncertain Β· low

Stage of Job: Pending Only Permits

Stage of PreCom: PreComm Complete

PC25 request pendingshould bePermit pending

The Primary Hold-Up "PC25 request pending" is further along than the dev-view gates, which still point to "Permit pending" β€” update the gate column so the stages catch up.

Basis: Stage of Job = Pending Only Permits

+ Add reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

Loc 3LR-GWmediumDev columns staleAI: uncertain Β· low

Stage of Job: Pending Only Permits

Stage of PreCom: PreComm Complete

PC25 request pendingshould bePermit pending

The Primary Hold-Up "PC25 request pending" is further along than the dev-view gates, which still point to "Permit pending" β€” update the gate column so the stages catch up.

Basis: Stage of Job = Pending Only Permits

+ Add reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35653516Loc 1LR-GWmediumDev columns staleAI: uncertain Β· low

Stage of Job: Pending Only Permits

Stage of PreCom: PreComm Complete

PC25 request pendingshould bePermit pending

The Primary Hold-Up "PC25 request pending" is further along than the dev-view gates, which still point to "Permit pending" β€” update the gate column so the stages catch up.

Basis: Stage of Job = Pending Only Permits

+ Add reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35663530Loc 1FusemediumHold-up staleAI: uncertain Β· low

Stage of Job: Installed, Commissioning Not Required

Stage of PreCom: PreComm Not Required

CN24 pendingshould beJob Completed

The dev-view gates have advanced to "Job Completed", but the Primary Hold-Up still says "CN24 pending" β€” advance the hold-up to match.

Basis: Stage of Job = Installed, Commissioning Not Required

+ Add reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35663600Loc 1FSmediumDev columns staleAI: uncertain Β· low

Stage of Job: Pending Only Permits

Stage of PreCom: PreComm Complete

PC25 request pendingshould bePermit pending

The Primary Hold-Up "PC25 request pending" is further along than the dev-view gates, which still point to "Permit pending" β€” update the gate column so the stages catch up.

Basis: Stage of Job = Pending Only Permits

+ Add reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35675422Loc 1LR-SELmediumDev columns staleAI: uncertain Β· low

Stage of Job: Pending Only Permits

Stage of PreCom: PreComm Complete

PC25 request pendingshould bePermit pending

The Primary Hold-Up "PC25 request pending" is further along than the dev-view gates, which still point to "Permit pending" β€” update the gate column so the stages catch up.

Basis: Stage of Job = Pending Only Permits

+ Add reviewer note

AI adjudication failed for this item β€” treated as a real finding until re-checked.

PM 35730950Loc 1SCADAMATEmediumHold-up staleAI: confirmed Β· high

Stage of Job: Pending Permits and Pre-Comm

Stage of PreCom: Pending Mapping

IT - Survey WO pendingshould beMapping pending

The dev-view gates have advanced to "Mapping pending", but the Primary Hold-Up still says "IT - Survey WO pending" β€” advance the hold-up to match.

Basis: Stage of PreCom = Pending Mapping

+ Add reviewer note

IT Survey Status is marked COMP, meaning the IT survey work order is no longer pending, which directly invalidates the current hold-up label. The computed Stage of PreCom has advanced to 'Pending Mapping' and DLT Site Visit Status is NOTN, confirming the project is now blocked on mapping rather than the IT survey. The Primary Hold-Up simply was not updated after IT Survey Status moved to COMP.

Action: Change Primary Hold-Up from 'IT - Survey WO pending' to 'Mapping pending'

PM 35691594Loc 1LR-GWlowNeeds reviewAI: confirmed Β· high

Stage of Job: Pending Only Pre-Comm (Permits Completed)

Stage of PreCom: Pending Device

Resource assignment pendingshould beDevice delivery pending

The Primary Hold-Up "Resource assignment pending" doesn't line up with the computed stage ("Device delivery pending") β€” review this case manually.

Basis: Stage of PreCom = Pending Device

+ Add reviewer note

Both controller_delivered (2026-07-01, future) and material_delivered (blank) confirm the project is blocked on physical device/material delivery, which is exactly what Stage of PreCom = 'Pending Device' reflects. 'Resource assignment pending' has no corresponding gate column supporting it and does not align with the computed stage. The hold-up label needs to be updated to match the gate-driven stage.

Action: Change Primary Hold-Up from 'Resource assignment pending' to 'Device delivery pending', consistent with Controller Delivered date of 2026-07-01 (future) and Material Delivered being blank, which drive Stage of PreCom = Pending Device.

Likely false positives (AI) β€” 2 hiddendeterministic flag stands; the AI is confident these are aligned
PM 35648466highDev columns staleAI: false positive Β· high

Stage of Job: Pending Permits and Pre-Comm

Stage of PreCom: IT/DLT information is missing

IT - Survey WO pendingshould be(fill IT/DLT dev columns)

The computed Stage of Job / Stage of PreCom aren't available, so the hold-up can't be checked β€” fill the IT/DLT dev-view columns and recompute.

Basis: Stage of PreCom = IT/DLT information is missing

+ Add reviewer note

The Primary Hold-Up 'IT - Survey WO pending' is fully consistent with Stage of PreCom = 'IT/DLT information is missing' and IT Survey Status being blank β€” all three signals agree the project is stalled waiting for the IT survey. The deterministic check fired only because the IT/DLT dev columns are blank (causing the stage computation to be indeterminate), but that blank state is itself consistent with the hold-up, not a contradiction of it. No mismatch exists; the correct next action is to update IT Survey Status once the WO is completed, not to change the hold-up.

Action: Fill in the IT Survey Status dev-view column once the survey WO status is known; no change needed to Primary Hold-Up at this time.

PM 35648467highDev columns staleAI: false positive Β· high

Stage of Job: Pending Permits and Pre-Comm

Stage of PreCom: IT/DLT information is missing

IT - Survey WO pendingshould be(fill IT/DLT dev columns)

The computed Stage of Job / Stage of PreCom aren't available, so the hold-up can't be checked β€” fill the IT/DLT dev-view columns and recompute.

Basis: Stage of PreCom = IT/DLT information is missing

+ Add reviewer note

The Primary Hold-Up 'IT - Survey WO pending' is fully consistent with Stage of PreCom = 'IT/DLT information is missing' and IT Survey Status being blank β€” all three signals agree the project is stalled waiting for the IT survey. The deterministic check fired only because the IT/DLT dev columns are blank (causing the stage computation to be indeterminate), but that blank state is itself consistent with the hold-up, not a contradiction of it. No mismatch exists; the correct next action is to update IT Survey Status once the WO is completed, not to change the hold-up.

Action: Fill in the IT Survey Status dev-view column once the survey WO status is known; no change needed to Primary Hold-Up at this time.

How this QC works

Stage of Job and Stage of PreCom are computed automatically from the manual dev-view gate columns. Primary Hold-Up is also entered by hand and should match where those stages say the project is.

Hold-up stale= the gates moved on but the hold-up wasn't advanced (e.g. Material Delivered is set, but the hold-up still says β€œDevice delivery pending”). Fix the hold-up.

Dev columns stale= the hold-up was moved forward but a gate column wasn't updated (e.g. hold-up says β€œConstruction scheduled” but pre-comm isn't complete). Fix the gate column.

Data inconsistency= the computed Stage of Job contradicts Open Dependencies (e.g. it reads β€œPending Only Permits,” which only happens when a permit dependency is open, but Open Dependencies is β€œNone”). The cached stage is stale β€” recompute the workbook or correct the dependency cell.

AI QC passdouble-checks every deterministic finding against the live gate values (Sonnet by default, cached per finding). It's advisory: high-confidence false positives are moved to the collapsed section, but the deterministic counts above are never changed β€” so the History charts stay reproducible. Each false positive it finds is also a signal to harden the underlying rules.

Owner, Resolved & Notes are saved to shared storage, keyed by PM-Location β€” so triage sticks across refreshes, teammates, and weekly dataset re-uploads. Use the bulk bar to assign or resolve every finding in the current filter at once.

Findings are deterministic; the AI pass and per-card β€œAI adjudicate” double-check individual cases against the live gate values. Snapshot generated 2026-07-10T06:20:03.363Z.